Delivery OS · Try it free
From Jira tickets to a status report in one click.
Pick a sample project, see the tickets your team has in Jira, and watch PMO Copilot turn them into a status pack and RAID log, with every line tied to a ticket. No sign-up.
1. Pick a sample project
2. This is what your team has in Jira
10 tickets on sample data: 1 blocked, 4 in progress, 2 to do, 3 done.
| Key | Ticket | Status | Owner | Latest comment |
|---|---|---|---|---|
| ERP-101 | Load opening balances | In Progress | Meera | Trial load 2 reconciled to within 0.4%. Third trial is set for Thursday. |
| ERP-102 | Payroll interface to the general ledger | Blocked | Arjun | Waiting for the vendor to confirm the file layout. No reply in 6 days. |
| ERP-103 | UAT: accounts payable scripts | Done | Divya | All 42 scripts passed on the second round. |
| ERP-104 | UAT: month-end close scripts | In Progress | Divya | 11 of 30 scripts run. 3 defects raised. |
| ERP-105 | Cutover rehearsal 2 | To Do | Kiran | Not scheduled yet. It needs the payroll interface (ERP-102) first. |
| ERP-106 | Defect: wrong tax code on credit notes | In Progress | Meera | Fix is in test. Retest pending. |
| ERP-107 | Finance team training | Done | Sana | All 3 sessions held. |
| ERP-108 | Decide the chart-of-accounts freeze date | Done | Kiran | Agreed with the Finance Controller. Changes after the freeze need CFO sign-off. |
| ERP-109 | Fallback plan: reopen the legacy system | To Do | Arjun | No owner confirmed for the 4-hour rollback window. |
| ERP-110 | Bank statement feed | In Progress | Sana | Assumes the bank opens its test endpoint on time. Not yet confirmed. |
3. Let PMO Copilot write the status report
Connected to Jira, PMO Copilot reads the week's activity and drafts the status pack and the RAID log. Every line points back to a ticket.